Sök:

Sökresultat:

6457 Uppsatser om Railway development - Sida 1 av 431

Långsiktigt spårväxelunderhåll - Förutsättningar och möjligheter

Due to their complexity and heavy wear from rail traffic, switches are a sensitive part of the railway infrastructure and moreover expensive to maintain. Furthermore, increasing railway traffic not only accelerates the wear rate but also obstructs the necessary maintenance measures. This paper examines the opportunities for a transition to a long-term maintenance strategy in the Swedish railway network. It contains a study of the maintenance strategy of Banverket, and also analyses statistics of errors in the railway infrastructure. The survey was completed utilising interviews with infrastructure managers, maintenance contractors, planners of railway operations and the Banverket material service department.

Älmhults köping 1901 - 1970 : Från räls till IKEA

In the beginning of the 1860s, an important railway was built between Malmö and Stockholm. The railway became one of the most important projects that would influence the entire southern Sweden. The railway line was located to areas outside the ordinary routes and a number of communities were built up along its way.Älmhult was one of the communities that was built up due to the railway. In the beginning there were only a few farms and a station, but a community developed and the village grew. In 1901 the village became a small market town, which was an important event.

Stationsutveckling i stad och på landsbygd : exempel från Gagnef

The intention of this final thesis is to look into the improvement of small and run down railway stations. Many railway stations are today derelict and decaying. The purpose of this essay is to propose alternative strategies of action by discussing the ecology, the history and the social function of the railway station. There is also an overview of projects already completed. In the analysis part of the thesis, the genius loci or the spirit of place is put forward as means of reaching a solution.

Järnvägsstationer i Litauen 1861-2011 : Namngivare, namnbyten och språkbyten genom 150 år

The names of railway stations and halts along the earliest railway lines on Lithuanian territory have been studied, i.e. along those railway lines built between 1861 and 1873. Especially, attention has been drawn to names that are not obvious regarding the geographical location of the station or halt. Some 50 percent of the names are showing some kind of irregularity in this respect. Most common (about 30 examples) are stations or halts that are serving a population centre situated at some distance from the station, but still bearing the name of that population centre.

Kisa Stationsamhälle : från kyrkoby till municipalsamhälle 1895-1905

The current field of research concerning the impact of railroads in Sweden beside from the State main-line network is relatively narrow. Including cultural impact to the area narrows the results even further. The purpose of this study is to open the field even more into the local societies and to what extent the impact of the introduction of railroad might have had on smaller county villages. Sweden holds a unique position concerning ?station towns? or ?railways towns? in terms of railway policy and the industrial development in towns that were affected by the railway, as the affected towns continued development were based on a hybrid between direct democracy and adaptations of city-law policies.This study takes place in Kisa, a small town in southern Östergötland that during the beginning of the 20th century turned into a municipal community due to the building of Östra centralbanan (roughly translated Eastern central-line).

En långsiktig järnvägslösning i Stockholmsregionen : En studie av vilka krav Trafikverket bör ta hänsyn till i sitt planeringsarbete

Travelling by train has increased during the last decades in Sweden. This has put pressure on the existing infrastructure and has created problems with delays and cancelled departures. The railway is a complex system with mutual dependencies and high vulnerability for disruptions. The situation for the railway system in the Stockholm region is today strained. The capacity is fully used.

Karlshamn-Wislanda Jernväg : Maktelit och nätverk i Karlshamns stad vid banans tillblivelse 1855-1874

The aim of this essay was to describe the power elite of the Swedish town Karlshamn, and its influences on the local political process before the realization of the narrow-gauge railway Karlshamn-Wislanda-Jernväg. During the mid 19th century, a revolutionary period began in the Swedish pre-industrial epoch. The political and institutional regulatory frameworks were disassembled and restructured, away from protectionism and centrally controlled administration, for the benefit of free trade, local self-government and liberalism. The changes were carried through during times marked by a drastic increasing native population and upcoming demands for adjustments to meet the growth of the industrial-, trade- and labour markets. An essential industrial development factor was the building of the national railway network, which started after some important decisions in the Swedish Riksdag during the 1850´s.

Kristianstad Kommuns destinationsutveckling : Utvecklingen utifrån tre hållbara aspekter

The ongoing construction of Kristianstad is a trade mall in the city center, the City Hall and the railway station neighborhood is rebuilding, new residential projects are planned and "The healthy garden", "Accessibility for everyone" and "ERA-farms" are also current. Kristianstad has always a sustainable way of thinking in the background during the development and they are trying to meet all three perspective of sustainability: economical, ecological and social. The municipality seeks knowledge both by sharing their own and takes part in other municipalities in the development process..

Värdering för markåtkomst vid järnvägs- och motorvägsbyggnation : en fallstudie av intrångsvärdering i området mellan Örebro och Arboga

The purpose of this work has been to investigate if there are any differences in the valuation process at infringements when highway and railway are built. The work has mainly been concentrated on the negotiation process in which The National Railway Department (Banverket) and The National Road Administration (Vägverket) try to get agreements with the land owners. The agreement includes compensation for infringement effects that affects the landowner?s property. The National Road Department uses the road law (Väglagen) when a highway shall be built.

Funktionsentreprenader inom Järnväg - möjligheter och hinder

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Utveckling Ulricehamn- om stora förändringar i en liten stad :

The purpose of this thesis is to inquire how a small town can be affected by some planned changes in the physical structure of the town, and how its inhabitants can benefit from those major changes. The town in question is Ulricehamn, and of the four projects considered, two concerns infrastructure. A new railway and a new locality for the major road, today passing through Ulricehamn. The other two projects are run by the local authorities, that is the planning of a modern town park by the lake, and a new public building for cultural purposes. There are no guarantees that any of the four projects will ever be realized, but in the process with this work, they have been considered as already a fact.

Gröna backar

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Prim, Stadsförnyelse i Barcelona

This final project discusses renewal and upgrading of the area of Prim. It is discussed how this industrial area can be an attractive neighborhood with a varied range of services and commercial trade. Prim is located 2km north-east of the center of Barcelona. The area boarders to a deep railway valley that historically has separated Prim from its neighboring districts. At present there is almost no housing, services or commercial trade within the area and the industry is discontinued or the existing industrial buildings are derelict.

Beslut om betydande miljöpåverkan för järnvägsprojekt : beslutsmotiveringar, åtgärder och regionala skillnader

This thesis examines the reasons to why railway projects conducted by Banverket (Swedish National Rail Administration) could be expected to cause significant effects on the environment, on which grounds the County Administrative Board and Swedish National Rail Administration base their decisions/assumptions and highlight regional differences between the different Swedish national rail administrations regions. Total 24 railway projects, conducted or being conducted, during the time period 2001 - January 2010 have been analyzed and studied. These projects represent eight different measures/activities which are dispersed throughout all five of the Swedish National Rail Administration´s different regions. Swedish legislations demands that the planner of a new railway project shall first conduct a pre-study and then conduct a public consultation which provides the participants an opportunity to provide input. The County Administrative Board shall then decide if the project could cause significant effects on the environment.

Kommunikationen av ett internationellt varumärke -En studie om IKEA

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

1 Nästa sida ->